Elevated Bridge B/C

andrewwski
Admin Emeritus
Admin Emeritus
Posts: 961
Joined: January 12th, 2007, 7:36 pm
Division: Grad
Has thanked: 0
Been thanked: 17 times

Re: Elevated Bridge B/C

Post by andrewwski »

Instead of spending so much time baking and experimenting with baking, you'd be more productive to spend that time working on other improvements to the bridge.
Balsa Man
Coach
Coach
Posts: 1318
Joined: November 13th, 2008, 3:01 am
Division: C
State: CO
Has thanked: 0
Been thanked: 3 times

Re: Elevated Bridge B/C

Post by Balsa Man »

I suspect the differences we've seen in dehydration/rehydration vs time curves may be mostly due to the difference in ambient humidity; much dryer out here, much wetter back there. We did one set of tests a couple years ago on a rainy day, and did see both the drying and rehydrating curves taking a bit longer, which reflects your observations.
Any wood is going to get to equilibrium with atmospheric moisture, and there is going to be some sort of time delay involved. The higher the density, and the greater the cross section, the slower the response. I'd think that the greater absolute amount of water involved at higher humidity would slow things down compared to smaller amounts at low humidity.

With the new wording added to the rules this year, that bridges will be weighed at the time of competition, I'm assuming the intent was to minimize any beneficial effect of......moisture management, and by and large, not completely perhaps, it will.

Thanks for re-emphasizing the heat will damage glue fact; I'd hate to see someone who has worked hard.....mess themselves up looking for that last little bit of help in the wrong place.

Len Joeris
Fort Collins, CO
Len Joeris
Fort Collins, CO
User avatar
croman74
Member
Member
Posts: 876
Joined: December 31st, 2008, 5:31 pm
Division: C
State: MI
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by croman74 »

I guess that it would be better not to bake and be on the safe side. Thanks for your help!
My 2010 Events
Elevated Bridge-7th
Trajectory-1st
"Why does Sea World have a seafood restaurant?? I'm halfway through my fish burger and I realize, Oh man....I could be eating a slow learner." -Lyndon B. Johnson
Image
rjm
Member
Member
Posts: 76
Joined: March 31st, 2002, 4:07 pm
State: MI
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by rjm »

If you are really that interested in moisture management, you would do better to store and transport the bridge with a dessicant so that it dries out gradually, and stays at a moisture equilibrium right up to the point that you present it for judging. At least that way you won't be stressing the joints with a differential expansion/contraction or a thermal stress.

Yes, the rules were intended to limit the effect of dehydration/rehydration of a structure. Basically, the intent was that the bridge should be tested as presented and as weighed-in, so that there would be no weight changes or strength changes from sitting around in impound all day. Testing should occur within minutes of weigh-in.

I used to coach Odyssey of the Mind, and we competed against a team that would bring in their structure in a hermetically sealed container, with a light bulb and batteries mounted on it. It was most complex and intimidating. I'm convinced it was really just done to make us worry about it.

I agree with Andrewwski, spend your time improving your bridge, not exploiting gimmicks.

Bob Monetza,
Grand Haven, MI
User avatar
computernerd4826
Member
Member
Posts: 186
Joined: September 20th, 2007, 7:43 pm
Division: C
State: TN
Has thanked: 0
Been thanked: 0
Contact:

Re: Elevated Bridge B/C

Post by computernerd4826 »

andrewwski wrote:Instead of spending so much time baking and experimenting with baking, you'd be more productive to spend that time working on other improvements to the bridge.
i agree entirely
Nationals Placements
CTW- 11th
Wright Stuff- 3rd
Road Scholar- 12th
Dyn. Planet- 27th
Bridge- 11th
Robo- 15th
Go Bearden Middle!
User avatar
croman74
Member
Member
Posts: 876
Joined: December 31st, 2008, 5:31 pm
Division: C
State: MI
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by croman74 »

rjm wrote:If you are really that interested in moisture management, you would do better to store and transport the bridge with a dessicant so that it dries out gradually, and stays at a moisture equilibrium right up to the point that you present it for judging. At least that way you won't be stressing the joints with a differential expansion/contraction or a thermal stress.

Yes, the rules were intended to limit the effect of dehydration/rehydration of a structure. Basically, the intent was that the bridge should be tested as presented and as weighed-in, so that there would be no weight changes or strength changes from sitting around in impound all day. Testing should occur within minutes of weigh-in.

I used to coach Odyssey of the Mind, and we competed against a team that would bring in their structure in a hermetically sealed container, with a light bulb and batteries mounted on it. It was most complex and intimidating. I'm convinced it was really just done to make us worry about it.

I agree with Andrewwski, spend your time improving your bridge, not exploiting gimmicks.

Bob Monetza,
Grand Haven, MI
I store my bridge in a closed container with some rice. It doesn't do much, but it doesn't do any harm. I also agree that I should focus on improving the bridge. Thanks for your tips.
My 2010 Events
Elevated Bridge-7th
Trajectory-1st
"Why does Sea World have a seafood restaurant?? I'm halfway through my fish burger and I realize, Oh man....I could be eating a slow learner." -Lyndon B. Johnson
Image
User avatar
sewforlife
Member
Member
Posts: 350
Joined: March 26th, 2009, 1:22 pm
Division: B
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by sewforlife »

Bjsong wrote:Can anybody post an average ratio of their or somebody else bridge ratio of how much it could hold to how much the bridge weighed. I'm competing in the state tournament next week and i just want to get a sense of what state bridge scores are like.
one ratio that is about avg. is a 18.5 gram weight, holding all of the sand. which is about an 810 efficiency
Nerds rule. Nerds are awesome. Nerds will someday (soon) rule the world. And you know it.

2010. Be prepared. If not, you f(l)ail!

One Team
One Dream
to REDEEM
User avatar
hbk.showstopper
Member
Member
Posts: 159
Joined: April 14th, 2008, 5:58 pm
Division: B
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by hbk.showstopper »

okay I get what you're saying but I think that it would be easier to build a tower instead of a bridge.
Definition of No Nuff
Def. #1-Not Enough
Def. #2-Too Much
User avatar
hbk.showstopper
Member
Member
Posts: 159
Joined: April 14th, 2008, 5:58 pm
Division: B
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by hbk.showstopper »

well did it do good??
Definition of No Nuff
Def. #1-Not Enough
Def. #2-Too Much
User avatar
hbk.showstopper
Member
Member
Posts: 159
Joined: April 14th, 2008, 5:58 pm
Division: B
Has thanked: 0
Been thanked: 0

Re: Elevated Bridge B/C

Post by hbk.showstopper »

:roll:
Definition of No Nuff
Def. #1-Not Enough
Def. #2-Too Much
Post Reply